Praga Studios

Prague, Czech Republic - In May 2019, the final inspection of Praga Studios in Karlín was completed. Arcadis carried out technical supervision and advisor to the investor throughout the construction of this remarkable project. The building is situated in the vibrant Karlin district in the heart of an established business location, where the cars of the famous Czech car factory Praga were repaired. Today it is a place designed to connect art and innovative trends.

12,000 m2

Total Area

7

Number of floors

With a total area of almost 12,000 m2 and seven floors, including 115 parking spaces, Praga offers an impressive atrium in addition to modern office space, where you can organize a concert or theater performance thanks to a smart solution. The construction started in the summer 2017, but before the actual implementation began, our team started working on documentation analysis. During the realization, Arcadis engineers carried out inspections of individual parts, concealed construction, adherence to the construction schedule and other activities connected with the construction.




The overall concept aims at LEED Platinum and WELL certification. The building, filled with the latest technologies and trends, inspires even the most demanding clients. Smart parking, which takes you to the specific place, smart screen in the atrium, thanks to which you will never run a train again, or stay without lunch. This and much more, covered by the unique Connected by Skanska operating system.



Outcomes

12,000 m2

Total Area

7

Number of floors

115

Parking spaces

Questions about this project

Ing. Zdeněk Trejbal

Head of Commercial Developers & Contract Solutions +420 602 374 297 Ask me a question

Ludek Friedl

Technical Supervisor +420 602 142 232 Ask me a question
Share on Wechat
"Scan QR Code" on WeChat and click ··· to share.