You have not accepted cookies yet

This content is blocked. Please accept marketing cookies. You can do this here.

2021

start of construction

2

trough structures

Currently Viewing

The challenge

Berlin is one of the world's most popular major cities — and it's growing. To enable its citizens to travel swiftly from A to B and to reach their homes, offices, theaters and sports facilities in a way that is both convenient and environmentally friendly, a strong public transport network is essential. Berlin's subway network is a key part of its local transport infrastructure. The embankment on the U6 line between Kurt-Schumacher-Platz and the Borsigwerke station is in need of restoration. The plans have been finalized and construction is due to commence at the end of 2021.

The solution

The double-track U6 subway line, which runs partially overground, is in need of some essential infrastructure restoration and modernization work. Exploratory research found that the stability of the embankment between Kurt-Schumacher-Platz and the Borsigwerke station could not be confirmed. As part of the infrastructure planning process, Arcadis defined a number of clear steps that can be implemented from the end of 2021.

  • Read more

    Embankment excavation and compression

    Across its entire cross-section, the embankment will be excavated to a depth of two meters below the rail track and compressed. To secure the embankment, a soldier pile wall will be constructed close to the existing embankment shoulder, which will act in conjunction with the existing embankment slope. The new construction will support the cable duct.

    The Arcadis team also looked closely at transitional areas around bridges. The entire rail track construction (rails, ties and ballast), the rail power system and the cable troughs will be replaced. Existing cable troughs will be removed and replaced by new, easily accessible channels. Drainage systems running alongside the track will be repaired.

    Legacy Waste Investigation

    Before the planning of the infrastructure and construction engineering works could get underway, Arcadis was instructed by the Berlin transport authorities to conduct a geotechnical survey, investigate the legacy waste and repair damaged trough structures.

The impact

Berlin's U6 subway line, which spans a distance of just under 20 kilometers between Tegel and Mariendorf, is a key part of the public transport network in the German capital. The restoration and modernization of the embankment structure and other infrastructure from the end of 2021 will strengthen the network for the future and cement the subway as an attractive transport option for people traveling around Berlin.


Used capabilities

Connect with {name} for more information & questions

Arcadis will use your name and email address only to respond to your question. More information can be found in our Privacy policy