• Engineering

Infrastructure - Pipeline Rehabilitation

Arcadis’ goals are to maximize flow capacity, reduce susceptibility to clogs, and minimize costs, construction time and disruptions

Jim Shelton

Senior Associate 866 287 7373 Ask me a question
Pipeline Rehabilitation

Maximizing flow capacity

Our design and construction management staff utilizes state-of-the-art, cost-effective approaches to pipeline rehabilitation, including:

  • Trenchless technologies
  • Cured-in-place pipe
  • Pipe bursting for aging clay sewer pipes
  • Sliplining with high-density polyethylene
  • Pipe lining of reinforced concrete sewers

Questions about this capability

Jim Shelton

Senior Associate 866 287 7373 Ask me a question