Camberwell, New South Wales, Australia - Environmentally responsible hydraulic advice to maximize long wall coal production in the Hunter Valley in New South Wales.

5.3M

tonnes of potential additional coal mine capacity

$A10M

project

Combining engineering and high level technical modelling to develop an ecologically robust flood scheme.

To extend Ashton Coal’s productive life a new mine design beneath Bowmans Creek, a tributary of the Hunter River at Camberwell, raised key environmental and regulatory challenges. 

Combining hard engineering and high level technical modelling, Arcadis helped to develop an ecologically robust scheme to divert two sections of Bowmans Creek. The new plan closely replicates the existing creek’s operational conditions to ensure flow, stream base and embankment stability, while encouraging fish populations through high water-quality levels.

Working closely with the client’s project team of hydrology and stream hydraulics specialists Arcadis created a cutting edge TUFLOW 3D model to accurately visualise any potential environmental impacts of a re-imagined creek. The 3D model developed by Arcadis was used for construction planning and on site verification.


Outcomes

5.3M

tonnes of potential additional coal mine capacity

$A10M

project

Questions about this project

Mitchell Bray

National Business Leader – Urban Development and Water +61 (0) 7 5503 4854 Ask me a question